10,000 Gallon UST Removal
Initially contracted to remove a concrete sump/clarifier for a Los Angeles County utility, E&E discovered a much larger, 10,000-gallon fiberglass underground storage tank. After determining the tank’s contents, E&E secured necessary permits and excavated to the spring line. The tank was cleaned and certified, then removed. Following soil sampling and analysis, the excavation was backfilled with clean soil and resurfaced. Challenges included working near high-voltage cables, coordinating with other contractors on site, and obtaining daily site-specific training and permits. Despite the initial misidentification, E&E adapted its approach to complete the project safely and efficiently.
20,000 Gallon UST Removal
E&E was contracted to remove a 20,000-gallon underground storage tank (UST) used for diesel fuel in Los Angeles County. After obtaining permits, E&E discovered approximately 6,000 gallons of diesel in the tank instead of the expected residue, which was then pumped and filtered for the client’s reuse. The team removed the overlying hardscape, excavated the soil, and prepared the fiberglass tank (initially thought to be steel) for removal. The void was backfilled and the surface repaved. Despite the unexpected fuel volume and tank material, E&E adapted to complete the project without impacting the client’s schedule.
1466 Soils Excavation 30,000 CY
E&E excavated approximately 30,000 cubic yards of soil contaminated with hazardous levels of Arsenic and Lead across a five-acre site in a busy Los Angeles neighborhood. Operating under strict Rule 1166 and 1466 monitoring, E&E carefully segregated two waste streams to prevent cross-contamination. Despite an initial scope of 9,000 CY, the project expanded significantly at the client’s direction, requiring around 1,600 truckloads for disposal. To mitigate costs, E&E implemented simultaneous excavation, stockpiling, and loading. The project was completed with zero resident complaints, track-out issues, or AQMD notifications, while navigating utilities and limited site access. Drone technology was used for site surveys.
Canyon Stabilization
A Southern California hillside property near residential areas faced significant slope stability issues due to unpermitted development and grading in the 1950s, exacerbated by a fire in the 1980s. E&E was contracted to implement a remedial grading plan using only existing site material. Tasks included clearing the property, removing utilities, excavating and re-compacting fill, and installing stormwater mitigation. Challenges involved client concerns about downslope properties, above-normal rainfall, limited equipment access, and neighborhood sensitivities. Despite these hurdles, E&E successfully restored the property to its pre-development condition, minimizing impact on neighboring properties and the local infrastructure.
Chemical Facility Decommissioning
E&E safely decontaminated, demolished, and closed a former chemical manufacturing facility that mixed and stored hazardous chemicals for 20 years. Key tasks included decontaminating various areas, demolishing structures like the loading station and wastewater treatment facility, removing tanks and process lines, and filling sumps. Challenges involved maintaining client access as employees still worked on-site and managing the containment of residual chemicals in numerous process lines. E&E developed a staged demolition plan, utilizing the existing wastewater treatment system for rinseate, and maintained close communication with the client to ensure safety and meet a strict project deadline.
Domestic SSDS
E&E installed sub-slab depressurization systems at multiple condominiums in an Orange County, CA private neighborhood, to remediate soil vapors. Each system included horizontal well casing, PVC piping, carbon vessels, a blower unit, and exhaust piping extending past the roof. Vapor pins were also installed for monitoring. Due to residents’ concerns about aesthetics and disruption, E&E fabricated custom compounds, precisely color-matched to the buildings, to conceal the systems and minimize noise. Initially hesitant, residents approved full installation after observing the minimal impact during a pilot project. Close collaboration with the client, HOA, and residents was crucial throughout the process.
Dual Phase Extraction Systems
E&E installed a remediation system at a busy Lake Havasu City gas station with 16 dispensers, working through a holiday weekend. The project included trenching, underground and above-ground piping installation, vapor extraction manifold construction, a custom fence, and a covered corridor for equipment. The system manages groundwater and vapor extraction, supplied air, electrical conduits, and sewer discharge. To maintain gas station access and safety, high-impact work was done at night. E&E coordinated with local partners for equipment and materials, who proved to be excellent and integral to the project’s success.
Dual SVE Systems
E&E constructed individual Soil Vapor Extraction (SVE) systems for two large, private residential gated communities in Orange County, CA. Extensive planning and community outreach were crucial in minimizing disruption to residents from noise and construction. The project involved trenching approximately one mile for PVC piping, and installing treatment systems on concrete pads. A key element was directional drilling beneath roadways and subsequent installation of HDPE welded pipe to provide power. Upon completion, all disturbed areas were restored with significant landscaping and over 200,000 sq ft of asphalt paving. The SVE equipment buildings were custom-designed to blend seamlessly with the neighborhood aesthetics.
Duct Bank Construction
E&E Construction undertook a complex project at a major rail yard, involving deep trench excavation, shoring, and installation of 3,600 linear feet of concrete-encased conduit duct banks. Facing incomplete designs, unstable soil, and numerous intersecting utilities (including high voltage lines), the team implemented various shoring methods and worked within 15 feet of energized active rail lines. Key tasks included trenching up to 16 feet deep, installing stacked conduits within rebar cages, and placing 9 large precast manhole vaults. Challenges involved constant design adjustments, managing hazardous soil, supporting existing utilities, and coordinating with concurrent demolition and track work, all achieved with zero injuries.
Emergency Erosion Protection
Heavy rains caused significant erosion at a public park built on a former landfill, threatening further damage and exposure of landfill debris. With limited time before more rain, E&E rapidly deployed emergency temporary BMPs. This included creating berms to redirect stormwater, installing multiple layers of visqueen to control sheet flow, and erecting fencing to secure affected areas and deter public access. E&E also surveyed the site to inform the design of permanent repairs planned for drier months. Challenges involved clearing thick brush on steep slopes and keeping the park open to the public. Notably, buried landfill materials were being exposed by the erosion. E&E later played a key role in designing and implementing the permanent solution.
Erosion Protection Final Remedy
Heavy rainfall severely eroded a public park, a former landfill, risking exposure of buried debris. After temporary fixes, E&E was brought in for a permanent solution. They used a design-build approach, collaborating on a comprehensive plan to repair damage and implement stormwater controls. Tasks involved extensive regrading, compacting slopes with hundreds of tons of imported material, repairing storm drains, and building berms and concrete curbs. Challenges included difficult equipment access on steep terrain and managing public safety due to unpredictable pedestrian movement within the active park, all while avoiding disturbance of buried landfill materials.
Gas Station Remediation
A Southern California gas station with persistent petroleum hydrocarbon contamination underwent a permanent remediation project. Previous efforts were insufficient, leaving a significant hotspot. The project involved excavating to 18 feet, below the groundwater level, within a confined and busy gas station. The excavation was backfilled with crushed rock mixed with ORC pellets to enhance bioremediation. The excavated soil was disposed of, and the site was backfilled with clean soil and resurfaced, including replacing curbs and restriping. Challenges included limited space, ensuring community safety near a sidewalk and bus stop, and mitigating odor impacting nearby residences.
GTS Pipeline Expansion
E&E successfully expanded a groundwater remediation system involving installation of 2,100 linear feet of pipeline and electrical conduit through an active, high-traffic shopping mall, the site of a former aerospace facility in Orange County, California. To maintain operational continuity, E&E utilized both open-cut trenching and horizontal directional boring. The primary challenge was executing these tasks during the peak Christmas shopping season. By implementing night shifts and rigorous health and safety protocols, the team ensured public safety and minimal disruption. The project concluded with successful pressure testing and full site restoration.
Heat Treatment Facility Demo
E&E decontaminated and demolished an abandoned heat treatment and manufacturing site, preparing the multi-acre property for redevelopment. The project involved decontaminating surfaces using specialized PPE, carefully removing numerous process lines and equipment, and demolishing structures using heavy machinery. A significant challenge was dealing with unidentified chemicals and a lack of site plans, requiring constant assessment and flexibility. Notably, E&E discovered 200 tons of hidden, solidified Sodium Nitrate. By researching and testing its purity, E&E arranged for its recycling by an Illinois manufacturer, converting costly waste into a usable product and saving the client significant expense.
Sub Slab Depressurization
E&E installed a sub-slab depressurization system beneath a new 94,000 sq ft warehouse in Azusa, CA, to mitigate potential chlorinated solvent vapor intrusion. This involved trenching and installing 2,300 linear feet of vapor collection piping within the building pad, followed by a 60-mil HDPE liner. After the concrete slab was poured, E&E connected the piping through the slab and roof, fitting each penetration with a wind turbine. These turbines create a constant vacuum, environmentally friendly extracting and exhausting the vapors above the roof without electricity. The project required precise coordination and communication with the General Contractor due to concurrent construction activities and paramount health and safety considerations in shared work zones.
Landfill Pond Closure & Conversion
E&E transformed a hazardous runoff pond at the Casmalia Superfund Site in California into a clean stormwater basin and wildlife habitat. The project involved dewatering the pond, installing a multi-layer RCRA cap to serve as a liner, and adding a clean soil cover. This conversion created a breeding ground for threatened and endangered species like the California Red-Legged Frog. Despite challenges with soft bottom sediments, the team successfully constructed new stormwater systems and restored the surrounding landscape. This effort was a critical component of the site’s long-term remediation, prioritizing habitat enhancement and sustainable water management.
Landfill System Upgrades
E&E conducted a major system upgrade at an EPA Superfund Site near Los Angeles, a former hazardous waste disposal facility. This complex project involved installing landfill vapor recovery wellheads, leachate pumping wells, and extensive HDPE and PVC lines, all under strict Superfund regulations. Key tasks included installing 1,000 feet of 24-inch PVC lines for methane recovery, treatment components for leachate, and dual-contained HDPE lines. Challenges arose from multi-party coordination and tying into active leachate lines containing toxic materials, requiring meticulous safety protocols and minimizing system downtime. The project also involved relocating buried landfill debris, adding unexpected elements that demanded intense monitoring and safety measures.
Landfill Operations & Maintenance
The Casmalia Resources Superfund Site, a former hazardous waste facility operating from 1973-1989, contains approximately 300 chemicals of concern. Under EPA oversight, E&E Construction manages operations in compliance with RCRA and CERCLA regulations. This includes subsurface liquids extraction, NAPL separation and disposal, liquids treatment, site monitoring, and maintenance of roadways, landfill covers, stormwater controls, and wetlands. A key challenge is navigating the oversight of multiple agencies and community stakeholders. Notably, the site is located in a sensitive environmental area, requiring careful protection of numerous protected species.
Maintenance & Fueling Depot FPRS
E&E installed a Free Product Recovery System (FPRS) at a Los Angeles CA fueling depot to address a significant diesel and LNAPL plume from historical USTs. Lacking existing plans, E&E employed a design-build approach, collaborating closely with the client to determine optimal trench layouts and component placement, minimizing disruption to the active facility. The project involved trenching, installing double-contained piping to seven extraction points, vaults, and pneumatic pumps with specific gravity skimmers to selectively recover fuel. Challenges included working within a fully operational site, managing utility crossings, and coordinating to maintain facility access, with the system split across two wash bays for efficiency.
MaxWell Stormwater Drain Install
As part of a redevelopment project for an LA Metro parking lot, E&E installed a MaxWell® Drainage System to manage stormwater runoff. Following the demolition of five buildings, E&E excavated the site, removing subsurface obstructions like pipelines and concrete tanks. The entire site was then over-excavated, moisture-conditioned, and compacted. Two deep holes were drilled, and two MaxWell® Drains were installed to a depth of 45 feet below ground surface. Challenges included limited space for equipment staging and addressing criminal activity on site with security measures. MaxWell® systems are a widely accepted method for stormwater infiltration and groundwater replenishment.
Paint Booths Decon and Demo
E&E demolished two large commercial paint booths, previously used for painting aircraft parts. Prior to demolition, all surfaces required careful decontamination. A key challenge was containing rinseate and dust within an active aerospace production area. This was achieved by first repurposing the existing paint booth structures for self-containment by pressure cleaning from the top of the vents, downwards, into the existing contaminated sumps within the booths for pumping into vacuum trucks, then skirting the entire area with visqueen curtains from floor to ceiling to prevent the migration of dust out of the work zone. This innovative approach to containment assured no disruptions to ongoing production.
PCB Abatement & Capping
E&E Construction safely removed PCB-contaminated materials and cleaned/capped affected concrete within an operational aerospace facility. This involved relocating heavy machinery, abating ceilings, walls, piping, and ductwork, and cleaning the concrete substrate. Working around ongoing operations and a tight schedule were key challenges. Accessing overhead systems required various lifts and scaffolding. To minimize disruption, the facility was divided into quadrants. Equipment was relocated, and plastic sheeting contained the work. Surfaces were cleaned, primed, and painted. The concrete floor was cleaned, coated with a two-layer epoxy warning system, and capped with a thick concrete layer.
POLA Lead Soils Remediation
E&E excavated and removed 15,000 cubic yards of lead-contaminated soil at the Port of Los Angeles, backfilling the site afterward. The project involved protecting high-tension power line footings, segregating soil stockpiles based on three contamination levels, and maintaining strict BMPs. Challenges included managing soil segregation for cost-effective disposal, working near high-voltage lines requiring special equipment precautions, and reinforcing dust control measures against strong winds. Traffic management was crucial due to high-traffic access routes, with flagmen and decontamination procedures implemented. The project successfully navigated these complexities.
POLB Sewer Line Repair
A bubbling sewage leak on a busy Port of Long Beach service road, dangerously close to the ocean, prompted an urgent repair. E&E was called to locate and fix the leak. Despite challenges like heavy traffic, a nearby railway, and inaccurate survey plans, E&E efficiently excavated two separate leaks (at 8 feet below ground surface), repaired the sewer line sections, and backfilled with slurry. All excavated soil was disposed of off-site. The project concluded with both areas simultaneously resurfaced with asphalt, minimizing disruption and saving costs.
Pump & Treat System
A major aerospace manufacturer in Riverside, CA, required groundwater remediation enhancements, leading to the construction of a Pump and Treat system to address contaminants like chlorinated VOCs, Hexavalent Chromium, and 1,4-Dioxane. E&E managed trench excavation, installed piping and a concrete treatment pad, and placed/anchored all treatment system components. Challenges included concurrent tasks, stringent security protocols requiring custom certifications, and navigating uncharted underground utilities, all overcome with zero incidents. Collaborative teamwork with the client yielded time and cost savings.
Railway Utilities Replacment
E&E decommissioned two failed nine-way duct banks along the Metro Blue Line in Long Beach, CA, which had caused sinkholes due to rainwater infiltration. The project involved using video to locate failures, developing a custom and highly effective grouting method to fill all voids in the old ducting, excavating a parallel trench, and installing new ducts. Pull lines were installed for Metro’s cabling, the new duct bank was encased with slurry, and the area was resurfaced. Key challenges included working safely within 10 feet of an active railway with overhead power, as well as precisely calculating slurry volumes.
Reservoir Storm Damage Repair
Recent heavy rainfall severely compromised a reservoir slope and hiking trail. E&E repaired the damage by excavating a large rut on the lower slope and filling it with compacted material. They then removed a back-buttress slope and keyway to install a 270-foot Vedura wall, backfilling with imported sand and installing drainage. The buttress slope was rebuilt using excavated soil, compacted, and equipped with storm drains and concrete spreaders. Finally, silt fencing and straw wattles were installed, and the area was hydroseeded. Challenges included working on steep slopes, managing pedestrian traffic, and coordinating material delivery within a tight work area, all while the reservoir remained partially active.
River Path Erosion Control
E&E mitigated flooding at an active airport facility, formerly a landfill, by controlling water runoff. The project involved regrading a basin and replacing its inlet and pump. A large concrete parking area prone to pooling was demolished and regraded with base material and asphalt to create a swale directing water to the basin. Additionally, asphalt curbing was installed, and three 100-foot HDPE storm drainpipes were laid to drain the basin. A 400-foot earthen berm was built to divert runoff, and the area was topsoiled and hydroseeded. Challenges included working at an operational airport visible to the public, in tight spaces, and on a tight schedule. Notably, portions of the airfield surface consisted of removable tiles requiring careful protection.
Sewer Improvements
E&E installed approximately 3400 linear feet of sewer line, including 13 manholes, for future land development, and resurfaced over 30,000 sq ft of asphalt and concrete across two active trucking centers and city streets. The project involved trench box shoring down to 16 feet. Unexpected challenges included discovering and abandoning a septic system, locating over thirty unknown utilities, and encountering VOC-impacted soils. Working across busy trucking centers required careful scheduling, with 25% of the work performed overnight. Navigating a busy public road necessitated thorough traffic controls. Despite these unknowns, E&E minimized schedule delays and received commendation for maintaining uninterrupted operations at the distribution centers.
Soils Remedy and Park Restoration
Impressed by E&E’s soils remedy work on a former Superfund Site in Maywood, CA, the City Council contracted them to further develop the cap to become an extension of Riverfront Park. The project included slope grading for ADA compliance, installing picnic amenities, building a picnic pavilion, and constructing stainless steel anti-graffiti walls. E&E also installed a multi-zone irrigation system with new pipelines, sprinklers, and controls, and placed new sod. Challenges involved bringing the park up to ADA standards and integrating old irrigation systems with new technology.
Spillway Demolition & Replacement
E&E addressed the deterioration of an old spillway at a large stormwater basin, where water seepage had created voids. The project involved demolishing the old structures, grading a steep slope, and installing an under-slab drainage system. A new spillway and inlet structures were built, along with a rip-rap section. To prevent further seepage, E&E excavated and recompacted a cutoff trench. The rocky soil and dry conditions posed challenges for grading and maintaining trench shapes, requiring daily cleanup. Completing the project on a long, steep slope during a heatwave demanded careful safety planning and high-heat procedures.
SSD Installation & Civil Improvements
E&E successfully installed a turnkey sub-slab depressurization system (SSDS) within an active facility. The project required excavating 730 linear feet of trenching to install 1,000 feet of PVC piping within aggregate and geotextile systems. To navigate structural constraints and design discrepancies, E&E utilized adaptive field engineering, including under-footing routing, concrete coring, and custom riser mounts. Executed under a site-specific Health and Safety Plan requiring Level C PPE, the project concluded with full concrete restoration. E&E’s seamless integration, proactive communication, and flexible problem-solving ensured long-term remediation capabilities without disrupting ongoing facility operations.
Stormwater Capture & Treament
E&E designed and constructed a stormwater management system for a Santa Ana skylight manufacturer to treat runoff with high sediment and metal content. The project featured the installation of extensive HDPE piping, stormwater collection boxes, above and underground storage tanks, and a Chitosan Enhanced Sand Filtration (CESF) system. A key challenge was keeping the facility operational during construction, which included navigating security gate and parking space modifications for tank placement using slide-rail shoring. The work was successfully executed during the rainy season, necessitating strong BMPs, and required on-site shoring redesign due to the water table.
Stormwater Infiltration System
To ensure a recycling and solid waste facility complied with regulations, E&E installed a large stormwater retention system. This involved designing the system within a parking area, removing pavement, and installing collection drains, pre-filters, and conveyance pipes. An infiltration bed was created in a 6-foot excavation with crushed rock and corrugated pipes. The inflow and outflow of an existing clarifier were rebuilt. Challenges included managing heavy truck traffic and mitigating excavation risks in sandy soil to prevent collapse. The completed system collects, filters, and disperses all surface water back into the groundwater via two infiltration galleries, with the area resurfaced in reinforced concrete.
Street Vaults & Piping Upgrades
E&E upgraded deteriorated well vaults and piping beneath a very busy main Los Angeles thoroughfare, replacing them with high-traffic manhole-style vaults and resurfacing asphalt and concrete. A major challenge was managing constant traffic flow, requiring meticulous planning and implementation of traffic control to ensure public and crew safety. The construction zone was secured nightly with trench plates and modified traffic control. Engineering controls were used to contain debris during demolition to protect passing vehicles and pedestrians. Due to high public visibility, extra attention was paid to site housekeeping and crew presentation.
SVE/AS System Install
E&E installed a 36-well Soil Vapor Extraction and 12-well Air Sparge system for a high-profile aerospace client. The project involved significant trenching through 18” thick reinforced concrete, installing thousands of feet of HDPE and PVC piping, and rehabilitating a building to house system equipment. Challenges included the thick reinforced concrete, excavating around numerous undocumented utilities without damage, and addressing unexpected VOC contamination and removal of over 1,000 tons of soil. Strict traffic control was necessary due to high on-site activity. The project’s success led to E&E being awarded an ongoing site-operations contract and many subsequent projects with the client.
SVE Manifold and Infrastructure
E&E undertook a complex project to construct a large, hidden underground manifold within half of an existing house in a residential neighborhood. This involved internal demolition, structural renovations, and subsurface construction within a confined 1900 sq ft space with low headroom, requiring excavation to 11 feet below ground. Sixteen conveyance pipes were installed for petroleum hydrocarbon removal. Challenges included a tight 3000 sq ft lot, a 16-foot-deep excavation near power lines, and strict 38-day completion timeframe with limited working hours. Precise pipe fitting in a narrow space and maintaining the house’s original facade were also key considerations.
Vacuum Enhanced FPRS
E&E installed a remediation system at LAX to recover an estimated multi-million-gallon jet fuel plume floating on groundwater. The complex project involved trenching through aircraft runways, installing various pipelines, 250 well vaults, 100 of which were aircraft rated, installing a free product recovery system, and f/o telemetry. Concrete resurfacing and managing airport security were also crucial. Challenges included strict airport security regulations and working within active airspace, requiring horizontal boring and overnight work. The project was phased and utilized a complex control system with fiber optics.
Wastewater Treatment System
E&E provided a turnkey process water treatment system for a local juice manufacturer to reduce solids discharge and regulate pH. This included trenching, piping (various types), foundation construction, placement and anchoring of treatment skids and tanks, concrete finishing, and electrical system installation. A key challenge was adapting to a change from underground to above-ground piping and relocating system components, requiring on-the-fly redesigns to maintain system logic and accessibility. Utilizing a hydrovac rig was crucial for safely and precisely locating numerous unidentified underground utilities. The entire 4-month installation was completed without disrupting the plant’s production.
E&E Construction Project Videos
View our gallery of E&E Construction Videos